Active Projects

Pars Drilling Fluids (PDF) is proud to offer an environmentally safe and cost-efficient solution for slop treatment through our chemical-free slop processing unit. Developed under our Total Fluids Management (TFM) strategy, this system is tailored for modern drilling environments that demand reduced environmental impact, faster deployment, and enhanced operational efficiency.

Projects
South Azadegan
South Azadegan

Year: 2021-Current     Oil Company: PEDEC    Contractor: Tadbir Development Drilling Co. (TDDC)    Wells: 17 Wells    Rigs: 2 Onshore Rigs

Nargesi
NARGESI

Year: 2020-Current     Oil Company: NISOC    Contractor: Dana Energy Co.
Well: 4 Wells    Rigs: 1 Onshore Rig

Masjed Soleiman / Maroun
Masjed Soleiman / Maroun

Year: 2024-Current     Oil Company: NISOC    Contractor: NDCO
Well: 2 Wells    Rigs: 2 Onshore Rigs

Ahwaz 1&4
Ahwaz 1&4

Year: 2021-Current     Oil Company: NISO   Contractor: OEID
wells: 15 Wells    Rigs: 2 Onshore Rigs

Sohrab
SOHRAB

Year: 2024-Current     Oil Company: POGC   Contractor: Dana
well Type: Vertical & Deviated    Depth: 3800±300m    Temprature: 180-220    Wells: 6    Rigs: 1

Cheshme Khosh
Cheshme Khosh

Year: 2024-Current     Oil Company: PEDEC- ZNV   Contractor: TDDC
well Type: Injection/drilling    Depth: 3900-4300    Temprature: 200    Wells: 6    Rigs: 3

Active Projects

Drilling Fluids Services

Waste Management

Brine Filteration

2023-South Pars Phase 12c

Abandonment

2022-South Pars Phase 17

Workover

2021-South Pars Phase 16

Appraisal

2020-YALDA

Exploration

2019-South Pars Phase 5

Workover

Waste Management