Completed Projects

Pars Drilling Fluids has successfully completed numerous drilling fluid projects across a variety of exploration, development, and production operations, earning a reputation for technical excellence and dependable service. Our completed projects demonstrate our ability to deliver customized drilling fluid solutions that improve drilling performance, enhance wellbore stability, reduce non-productive time, and support safe, efficient operations in diverse geological environments. Each successful project reflects our commitment to quality, innovation, operational excellence, and long-term client satisfaction, reinforcing our position as a trusted partner in the oil and gas industry.

South Azadegan
South Azadegan

Year: 2021-2023     Oil Company: PEDEC    Contractor: TDDC    Wells: 15 Wells

South Pars Phase 5
South Pars Phase 5

Year: 2019     Oil Company: POGC    Contractor: DCI
Well-Type: Workover    Depth: 4000±500     Temprature: ±235     Wells: 12     Rigs: 1

Yadavaran Development of Phase I
Yadavaran Development of Phase I

Year: 2024-2013     Oil Company: PEDEC    Contractor: SINOPEC
Well-Type: Development
Well: 23 Wells    Rigs: 7 Onshore Rigs

Ahwaz
Ahwaz

Year: 2020-2022     Oil Company: NISOC   Contractor: OEID   Well Type: Horizontal and High deviated, Vertical (Drilling and Work-over)   Depth: 3150±50m    Temperature: TBA   wells: 2 Wells    Rigs: 1-2

Darquin Oil Field Appraisal
Darquin Oil Field Appraisal

Year: 2024-2011     Oil Company: Arvandan Oil and Gas Co    Contractor: OEOC
well Type: Vertical    Depth: 4700±100    Temprature: ±270    Wells: 2    Rigs: 1

Cheshme Khosh
Cheshme Khosh

Year: 2022-2024     Oil Company: ZNV   Contractor: POSCO Drilling Co. (TDDC)
Wells: 4

Completed Projects

Offshore Drilling Fluid Services

Onshore Drilling Fluid Services

Waste Management Services

HPHT (High Pressure, High Temperature)

Material Supply

Brine Filtration

2023-South Pars Phase 12c

Abandonment

2022-South Pars Phase 17

Workover

2021-South Pars Phase 16

Appraisal

2020-YALDA

Exploration

2019-South Pars Phase 5

Workover

Waste Management