Active Projects

At Pars Drilling Fluids, we are actively supporting a range of drilling operations by delivering reliable, high-performance drilling fluid solutions tailored to the unique requirements of each project. Our ongoing work spans exploration, development, and production wells, where we provide customized fluid systems, technical engineering support, and continuous on-site monitoring to maximize drilling efficiency, maintain wellbore stability, and minimize operational risks. Through a commitment to innovation, quality, and environmental responsibility, we work closely with our clients to optimize drilling performance while ensuring compliance with industry standards and project-specific objectives.

Projects
South Pars Phase 11A
Drilling Fluid Services

Year: 2025-Current     Oil Company: POGC   Contractor: PETROPARS
Depth(m): 3400±400   Temperature (F): ±210   Wells: 12    Rigs:1

South Pars - Infill
Drilling Fluid Services

Year: 2024-Current     Oil Company: POGC  Contractor: PECO    Depth(m): 3200±400  Temperature (F): ±210  Wells: 4    Rigs:1

South Pars - Infill
Drilling Fluid Services

Year: 2024- Current     Oil Company: POGC   Contractor: DCI    Depth(m): 3200±400  Temperature (F): ±210
Wells: 9     Rigs:

South Pars - Phase - 11B
Drilling Fluid Services

Year: 2024-Current     Oil Company: POGC  Contractor: PETROPARS
Depth (m): 3400±400
Temperature (F): ±210
Well: 2     Rigs: 2 Onshore Rigs

Sohrab
Drilling Fluid Services

Year: 2025-Current
Oil Company: PEDEC    Operator: DANA SOHRAB
Depth (m): 3800±300
Temperature (F): 180-220
Wells: 6     Rigs: 2

Cheshmeh Khosh
Drilling Fluid Services

Year: 2024-Current     Oil Company: PEDEC-ZNV  Contractor: TDDC 
Depth (m): 3900-4300
Temperature (F): 200
Wells: 6    Rigs:3

Cheshme Khosh
Drilling Fluid Services

Year: 2022-Current     Oil Company: PEDEC-ZNV  Contractor: POSCO
Depth (m): 3900-4300
Temperature (F): 200
Wells: 2    Rigs: 2

Arvand
Waste Management Services

Year: 2025-Current     Oil Company: Arvandan ContractorKOGC 
Wells: 2    Rigs:1

Cheshmeh Khosh
Waste Management Services

Year: 2024-Current     Oil Company: ZNV  ContractorTDDC 
Wells: 6    Rigs: 3

Maroun
Waste Management Services

Year: 2024-Current     Oil Company: NISOC Contractor: NDCO
Wells: 2    Rigs:2

South Azadegan
Brine FIlteration

Year: 2021-Current     Oil Company: PEDEC  Contractor: TDDC
Wells: 17    Rigs: 2

Ahwaz 1&4
Brine Filteration

Year: 2021-Current     Oil Company: NISOC Contractor: OEID
Wells: 15    Rigs: 2

Active Projects' Details

Drilling Fluids Services

Waste Management

Brine Filtration

2023-South Pars Phase 12c

Abandonment

2022-South Pars Phase 17

Workover

2021-South Pars Phase 16

Appraisal

2020-YALDA

Exploration

2019-South Pars Phase 5

Workover

Waste Management