Completed Projects

Pars Drilling Fluids (PDF) is proud to offer an environmentally safe and cost-efficient solution for slop treatment through our chemical-free slop processing unit. Developed under our Total Fluids Management (TFM) strategy, this system is tailored for modern drilling environments that demand reduced environmental impact, faster deployment, and enhanced operational efficiency.

South Azadegan
South Azadegan

Year: 2021-2023     Oil Company: PEDEC    Contractor: TDDC    Wells: 15 Wells

South Pars Phase 5
South Pars Phase 5

Year: 2019     Oil Company: POGC    Contractor: DCI
Well-Type: Workover    Depth: 4000±500     Temprature: ±235     Wells: 12     Rigs: 1

Yadavaran Development of Phase I
Yadavaran Development of Phase I

Year: 2024-2013     Oil Company: PEDEC    Contractor: SINOPEC
Well-Type: Development
Well: 23 Wells    Rigs: 7 Onshore Rigs

Ahwaz
Ahwaz

Year: 2020-2022     Oil Company: NISOC   Contractor: OEID   Well Type: Horizontal and High deviated, Vertical (Drilling and Work-over)   Depth: 3150±50m    Temperature: TBA   wells: 2 Wells    Rigs: 1-2

Darquin Oil Field Appraisal
Darquin Oil Field Appraisal

Year: 2024-2011     Oil Company: Arvandan Oil and Gas Co    Contractor: OEOC
well Type: Vertical    Depth: 4700±100    Temprature: ±270    Wells: 2    Rigs: 1

Cheshme Khosh
Cheshme Khosh

Year: 2022-2024     Oil Company: ZNV   Contractor: POSCO Drilling Co. (TDDC)
Wells: 4

Completed Projects

DFS

Onshore DFS

WMS

HPHT

Material Supply

BRINE Filtration

2023-South Pars Phase 12c

Abandonment

2022-South Pars Phase 17

Workover

2021-South Pars Phase 16

Appraisal

2020-YALDA

Exploration

2019-South Pars Phase 5

Workover

Waste Management